  Preface  
Key Elements:
 
bullet Plant  Reliability/ Continuity  of  Operations
bullet Schedule:
  1. Turkmenistan Kaolin Washing Plant
  2. Abadeh Cement Project
  3. Ekbatan Cement Project
  4. Alborz Hydration Lime Plant
  5. Kavir Kashan Cement Project
 
 

 

 

 

 

     

 
  Preface:  
  I.I.D as the mother company of the group has had extensive experience in the engineering, design, procurement, construction and commissioning of rock products processing plants, the majority of which were executed on a turn key basis. Successful projects have been executed by I.I.D in Iran and in Central Asian countries which attest of the international experience within the group, and have firmly established our credentials as a stable and reliable contractor with total in-house capability.

The extensive experience obtained by the group of companies is shared on a continual basis through interchange/secondment of personnel and bi-yearly technology seminars.

Further more I.I.D has been cooperating with well known and reputables companies well known in Europe for realization of the industrial projects.

I.I.D takes pride in its excellent relationship with all of its clients.

This reflects a commitment to participation by all parties during the execution of the project and long term "after sales" services which is provided in the form of trouble shooting, site inspection during turn around, etc. I.I.D has been very successful in developing these long-term relationships and consider this aspect to be a key business objective. This has only been possible by generating an outstanding level of confidence and trust in the technical and project execution capabilities, commissioning and post-commissioning support, and recognizes strong and continuing commitment of the business as an important strategic component of our overall business portfolio.

Based on long term experience, I.I.D has successfully applied know how and technology on numerous projects. In this respect, the vast experience of I.I.D allows us to execute projects based on process design data provided by the client, supplemented by update mechanical and electrical features.

In summary, I.I.D will provide a superior level of commitment, technical expertise, project execution capability, post commissioning support and a real intent to form a long-term association. This team approach will provide the client with the confidence they need to proceed with a "winning" team.


<<Back to Top >>

 
  Key Elements:  
  The following is a brief overview of what we consider to be the "key elements" of any successful project.

<<Back to Top >>

 

 
Plant  Reliability/ Continuity  of  Operations
  The proposed plant is ‘state of the art’ in terms of plant reliability and continuity of operations.

Consequently, only commercially proven technology is specified as an acceptable design with an appropriate factor of safety. Experimental or unproved minimal design standards are not part of the I.I.D technical strategy.

Where appropriate, installed spare units are provided to insure the continual operation of the unit is not jeopardized.

I.I.D fully believe that our strategy of providing proven yet ‘state of the art’ technology backed by vast industry experience provides the correct formula for success in our chosen market area.

<<Back to Top >>

 

 
Schedule:
  Recognizing the need for a " fast track project" is important as revenues or compensation for the project can only be generated when a plant is successfully operating and realizing income. The following are a sample of project related schedules

<<Back to Top >>

   
  Turkmenistan Kaolin Washing Plant
This project (20,000 t/d annual production of washed kaolin) was awarded to I.I.D on July 5,1994 on a turnkey basis at the conclusion of an international competition . The key element in winning the project was a commitment to a very "tight" schedule . Turkmen require the plant to be ready for operation by Jun 5,1996 (23 months from date of order to start up). This plant was successfully started on time .

Our current rate of progress indicates the job end date will be achieved and as noted below, our experience with Turkmen gives us confidence the Owners expectations will be realized .

<<Back to Top >>

  Abadeh Cement Project
  This project (500 t/d) was awarded to I.I.D on 26.02.1987 on a turnkey basis at the conclusion of loan from Iranian Saderat Bank .

This plant was successful started on 30.09.1993 .

 

 

 

<<Back to Top >>

  Ekbatan Cement Project
  This project (500 t/d) was awarded to I.I.D on 22.09.1992 on the basis of engineering and supply of equipment only with erection by the Owner.

Engineering and procurement work have been completed by the end of Aug, 1993 with delivery of some equipment continuing until mid Oct. 1993.
 
 

 

 

<<Back to Top >>

  Alborz Hydration Lime Plant
  This project (200 t/d) Hydration Lime plant was awarded to I.I.D on April 5,1986 on a turnkey basis at the conclusion of loan from Iranian Saderat Bank .

This plant was successful started on Aug 17,1989 .

 

 

 

<<Back to Top >>

   Kavir Kashan Cement Plant
  This project (2000 t/d) was awarded to I.I.D on 12.07.2001 on the basis of and EPC Project Engineering , procurement and Construction work have been completed by the end of Aug, 2005 


 

 

 

<<Back to Top >>

  

 